MOLDING TALK EP.18 – The IMPLEMENTATION of the 1st TRY-OUT;(New mold)
Mold design is correct, mold functions passed the commissioning, plastic, and suitable machine are ready. The implementation of the try-out, the new mold must come across the preparation and state at the point that the mold is ready to start the 1st shot.”

รูปภาพประกอบด้วย ข้อความ, บุคคล, อุปกรณ์อิเล็กทรอนิกส์, ทำท่าทาง
คำอธิบายที่สร้างโดยอัตโนมัติ

MOLDING TALK EP.18 held on October 14, 2021. It is a regularly 1-hour casual talking, experience sharing, Q&A

with experiences molders launched from Bangkok at 1:00 PM on Thursday(every 2 weeks) through Google Meet. The talk was moderated by Mac (Fluent Thailand) and Hank (Effinno Technology; Taiwan). aim at providing the systematic injection molding pieces of knowledge and experiences to the molders in the industry.

This week, we talked about the “IMPLEMENTATION” of the 1st try-out (new mold). How to handle the try-out with the new mold which already came across the mold commissioning; without any mold movement problems, without water leakage, correct mold design/gate/runner/air venting all are correct and can-do automatic cycle run.

And welcome the new audience from Malaysia(Bottom left) who joined us the first time. He knew MOLDING TALK from an email from his friend. Mr.Nart, the senior molder came back to join MOLDING TALK again after few weeks. Nart is now working as the individual consultant after he retire from his work(Blue shirt-Top left). 

Question :, What is the first thing the systematic molding implement in the 1st try-out ? Mac asked to HANK.
HANK Tsai :  Mold temperature setting must do the 1st. The correct mold surface temperature follows the plastic manufacturer recommendation is very important, the simulation results can be used for reference. Avoid using the water from cooling tower which without of the temperature control. The extra important is the water temperature must be under control. The water from open system and without the monitoring is very secure to the stability and robustness of the cycles.

Question : How about the mold temperature control in America that the weather is different from Thailand, especially when the winter ?  The close system applies used in US, due to the very cold in the winter the open system made water transform to an ice. It is like the country which having snow., Mac asked to Mr. NART and his answered.

MTC; Mold Temperature Control with close system only we applied in Malaysia, Mr. Salim share with us.

 Question : Since mod temperature was set. How do you ensure the mold surface is correct and stable for the 1st shot.?
HANK Tsai : The touching measure by the temperature measure device should apply. Specify the points on the mold surface both on Core and cavity sides 4 points each then record.

รูปภาพประกอบด้วย ข้อความ, อุปกรณ์อิเล็กทรอนิกส์
คำอธิบายที่สร้างโดยอัตโนมัติ



Mac : The control of water flow rate, water temperature through each water circuits can help the molders monitor the change of mold temperature from the change of water temperature (https://fluent.co.th/mouldflo-cooling-sensors/). The Infrared temperature camera(IR Camera) can also help to know the hot spot and monitor the mold surface temperature.  

Question : The next after mold temperature correct setting ?

HANK Tsai : Melt temperature, back pressure, screw speed is the related to give the right molten plastic temperature. The recommendation from the plastic manufacturer is the most important.
Mr. NART : Melt temperature must be measured by the pyrometer before injecting into the mold cavity.
Mr. Salim : Yes, we do the purge then dip the pyrometer into the molten plastic.
Mac : The Melt temperature measurement to know the peak molten temperature was shared  by Mac. The Pyrometer and how’s it work (Ref. : https://www.youtube.com/watch?v=H7ghGyeVsDM)

Question : What is the next step, and how ?

Follow us the next 2 weeks ! The continue IMPLEMENTATION of the 1st try out will held again in the next episode. EP.19 on  OCTOBER 28, 2021 at 1:00 PM Bangkok time.

The past episode, EP.1 – EP.18 were recorded by Google Meet video recording system. Follow this link https://tinyurl.com/h544xnbv, if you interest in checking out our Molding Talk recorded.

For more information, please visit www.fluent.co.th

Subscribe to receive the update of Injection Molding news, events, and seminar, hit this below link. http://eepurl.com/g01BWn